Harman Stove Company PB 105 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Poêles Harman Stove Company PB 105. Harman Stove Company PB 105 User's Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 48
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0


 

 

 

    

 




“Ce manuel est disponible en Français sur demande”


Vue de la page 0
1 2 3 4 5 6 ... 47 48

Résumé du contenu

Page 1 - 

  

Page 2

10Fig. 3Avoiding Smoke and Odors - Negative Pressure, Shut-down and Electrical Power Failure.To reduce the probability of back-drafting or burn

Page 3 - 

11The minimum vent conguration is a 90o or Tee on a starter collar and a 24” length horizontal through an exterior wall. A cap on the end should di

Page 4 - 

12Chimneys taller than 20’ above the connection will require a draft test to determine if the draft is too high.Note: The high burn draft shoul

Page 5 - 

13Outside AirTo install outside air, use 2 3/4” I.D.galvanized steel ex pipe, part # 2-00-08544 ( 12’ 6” length) or part # 2-00-08545 ( 25’ lengt

Page 6 - 

14To install power to the boiler, rst remove the cover on the 4” X 4” junction box located on the back of the unit. There are

Page 7

15Installing DuctCold return water temperature (Sustained temperatures below 140 degrees Fahrenheit) will lead to condensation in th

Page 8

16Installing Duct/Air ConditioningBoilers intended to be connected to an existing boiler or boiler system shall:1. Be capable of being ins

Page 9 - = Air supply inlet

17NOTE: ALWAYS REFER TO THE INDIVIDUAL COMPONENTS RECOMMENDED INSTALLATION INSTRUCTIONS FOR THE PROPER MOUNTING POSITION AND LOCATION WITHIN THE PIPIN

Page 10

18* PRESSURE RELIEF VALVE* TEMPERATURE/PRESSURE GAUGEAIR VENTTYPICAL BOILER HOT WATER PIPING SHOWING AIR REMOVAL SYSTEM, PROVISIONS FOR TH

Page 11 - “PL” Vent pipe

19Cold return water temperature (Sustained temperatures below 140 degrees Fahrenheit) will lead to condensation in the rebox. This

Page 13 - 

20 20OverHeat Safety Zone (Dump Zone): STRONGLY RECOMMENDED in all installations.When the pellet boiler is operating at High burn

Page 14 - 

21 Draft Test ProcedureAfter the venting is completed, the rebox low draft will need to be checked and possibly adjusted. After removi

Page 15 - Installing Duct

22Fuel and Fuel StoragePellet fuel quality can uctuate from manufacturer to manufacturer, and even from bag to bag. Hearth & Home Technologies re

Page 16

23Power LightIndicates power to the control board.Status LightWill be lit anytime there is a call for heat.Combustion Blower LightIndicates Power t

Page 17

24Setting The Boiler TemperatureWithout the Outdoor Air Temperature Sensor Installed To set the maximum boiler water temperature, sim-ply turn

Page 18

25Pellet Boiler Outdoor Air Reset OperationWhen the outdoor sensor is installed, at 20° F. or below OAT (Outdoor Air Temperature), the boiler

Page 19

261. Turn Mode Selector to “OFF”.This resets the control in addition to turning it off. Starting A Fire Automatically2. Clean Burnpot with sc

Page 20 - 

274. If Starting After an Empty Hopper, Turn Feed Adjuster to “TEST” (for one 60 second cycle). This will feed pellets into the auger tube and

Page 21 - The Control

288. Turn the MIN. TEMP. Dial on the control board to the desired Minimum temperature. This will start the lighting process if the temperature at the

Page 22 - 

29NOTE: Stirring the starting gel into the pellets usually allows the re to become established quicker.CAUTION: A vapor ash could occur if

Page 23 - 

3Hopper Lid LatchesHopper Control Board CoverControl BoardCombustion BlowerCombustion Blower CoverTemperature / Pressure GaugePressure Relief ValveAqu

Page 24

30Fig. 18Burnpot Cleaning: The burnpot should be cleaned no less than once a week. For best operation the burnpot should be cleaned every time the hop

Page 25

31Ash RemovalIt is recommended to remove the ashes when the boiler is not in operation. This lessens the chances of coming in contact with

Page 26 - Ash Pan Handle

32CleaningThis cleaning should be done after each ton of pellets used. The frequency of this cleaning will be directly related to

Page 27

33The boiler MUST be OFF and COOL before you should attempt to clean the combustion blower.The wire to the combustion blower doesn’t need t

Page 28

34 1. No pellets in hopper.2. Firebox draft may be too low for low draft pres-sure switch in feeder circuit to operate. 

Page 29

35Atmospheric Conversion: Item # 1-00-232200, provides automatic ll, and converts the heating system plumbing from pressurized

Page 30 - 

08/11IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement parts for your appliance please provide model number an

Page 31

08/11IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement parts for your appliance please provide model number an

Page 32

08/11IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement parts for your appliance please provide model number an

Page 33

08/11IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement parts for your appliance please provide model number an

Page 34 - 

4                           

Page 35 - 

08/11IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement parts for your appliance please provide model number an

Page 36 - 

41BTU Input Range= 0, and 9350 to 113,900*0 BTU if system is satised.Min. Burn = 1.1 pound per hourMax. Burn = 13.4 pounds per hour* 850

Page 37

42GREEN/YELLOWDARK BLUE PELLET BOILER WIRING DIAGRAM4" SQUARE JUNCTION BOXBLACKGREEN/YELLOWWHITEREDREDWHITEGREEN3/8"FLEX CONDU

Page 38

43 “105 Series” PELLET BOILERWHITEGREENRelay enclosure box -GRAINGER # 1EGH7REDREDWHITEGREENDPDT RELAY flange mtd. -GRAINGE

Page 39

44WoodHearth & Home Technologies, Inc.WARNING: Risk of fire - Do not operate with the flue draft exceeding -.9 in Water Col

Page 40

45

Page 41 - 

46

Page 42 - 

47Proudly Printed On 100% Recycled Paper

Page 43 - 

1 Turn Mode Selector to OFF.2 Use heat exchanger cleanout rods to clean the heat exchanger tubes.**3 Scrape the air holes in the burnpot.**4 Fill

Page 44 - 

5HARMAN™ CENTRAL HEATING PRODUCTS LIMITED WARRANTYHearth & Home Technologies Inc., on behalf of its Harman™ brand (”HHT”), extends the fol

Page 45 - 

6Boiler Kit Materials: (Refer to page 3)List of items contained within the boiler kit shipped with the unit. 1 - Control board cover 1 - Acc

Page 46

7Design:The rst thing that needs to be done is deciding where and how the boiler will be installed.Things that need to be taken into considera

Page 47

8NOTE: All installation clearances and restrictions must be adhered to.INSTALLATION IS TO BE PERFORMED BY A QUALIFIED INSTALLER.NOTE

Page 48

9Requirements for Terminating the VentingWARNING: Venting terminals must not be recessed into a wall or siding.NOTE: Only PL vent pipe wall pass-throu

Commentaires sur ces manuels

Pas de commentaire